Landing Strip Inkwe Game Farm (Vaalwater area Limpopo)

Scope of work

The owner of the game farm is a pilot and saw the need for a landing strip on his own farm. He contacted us to build the strip on his farm.

Keeping all the factors in mind a appropriate site was allocated. The area was surveyed and the construction started. Water drainage system was installed. Soil was compacted in layers and the final layer was stabilized. The total length of the strip is 1200 meters and the width is 25 meters.

The area where hanger was to be constructed was prepared and the taxi ways was constructed.

Latest News

Follow us on